Some emissions are hard to avoid by switching fuels: cement, steel, chemicals and some power and gas processing. Carbon capture and storage takes the CO2 before it reaches the air and puts it deep underground. It does not replace efficiency and renewables, but it can cover emissions that nothing else can easily reach.
CCS is a chain of three links. First the CO2 is captured and purified, then it is compressed and transported by pipeline or ship, and finally it is injected into a rock formation and monitored. The project works only if all three links are in place and match each other in size and timing.
In post-combustion capture the flue gas from a boiler or furnace passes through a solvent that absorbs the CO2. The solvent is then heated to release a nearly pure stream of CO2 and reused. It can be added to existing plants, but it needs steam for heating, which adds to the energy the plant uses.
Some processes already produce streams that are rich in CO2, such as hydrogen and ammonia plants, ethanol fermentation and gas processing. Capturing from these is cheaper, because the CO2 is concentrated and often at high pressure. They are usually the first projects to go ahead.
Once captured, CO2 is compressed until it behaves like a dense liquid, which makes it efficient to move. Pipelines are the main choice for large, steady flows on land or at sea. Ships can carry CO2 from many smaller sources to a central storage site. Water and impurities must be controlled to protect steel from corrosion.
CO2 is injected more than about 800 metres underground, where pressure keeps it dense. Good storage needs a porous reservoir rock such as sandstone to hold the CO2 and a tight sealing layer above it. Over time the CO2 dissolves in water and some turns to mineral, so storage becomes more secure as the years pass.
Operators must show that the CO2 stays where it was put. They watch injection pressures and rates, repeat seismic surveys to see the plume, sample groundwater and soil gas, and check wells. The monitoring plan is agreed with the regulator before injection starts and updated as the site is better understood.
CCS needs clear rules on permits, liability and long-term responsibility for the stored CO2. It also needs a reason to pay: a carbon price, a subsidy or a customer who values low-carbon products. Costs depend heavily on the capture source, the distance to storage and whether infrastructure is shared.